Three Phases Of The Project
Phase 1
Sugar Pine Road (just south of White Fir Road) is a dirt road that must be paved. A total of seven (7) lots with an average size of 14,000 Sq. Ft. will be place in between south of White Fir Road; and north of Sugar Pine Road. Average size of the homes would be 3,000 Sq. Ft. The architectural look of these homes will be different from the ones in other phases since these homes’ exterior must match with the existing homes and condominiums that already exist in the area.
Phase 2
A total of nine (9) lots with average size of 14,000 Sq. Ft. will have luxury homes (tri-level – 5,000 Sq. Ft. or less with a footprint of 1,200 to 1,700 Sq. Ft.) with entry level next to three car garages off Cedarwood Drive on a downslope with boundaries ending at Oakwood Drive.
Phase 3
A total of (25) lots with average size of 14,000 Sq. Ft. to build luxury homes (tri-level – 5,000 Sq. Ft. or less with a footprint of 1,200 to 1,700 Sq. Ft.) in between North Bay Road and Cedarwood Drive. A total of six (6) lots will be fronting North Bay Road and the other nineteen (19) will be built at a higher elevation with lake views. In this phase, we would be connecting the present “dead end” Cedarwood Drive to Cedarwood Place (new road) that will connect to Arrowhead Lane, ending at the club house on a private road. The new road which is not paved, loops around the project to connect all homes within the project.